Here, A New Legacy of Estate Living Begins

Rosehurst Construction Guidelines

4.0 LANDSCAPE

4.10 Foundations

Minimum slab elevations should be determined in accordance with the Harris County Drainage District Drainage Criteria Manual and not less than 18” above the top of the road crown at the front of the lot. All foundation plans must be signed and sealed by a Texas Registered Professional Engineer.

A form survey should be undertaken to ensure that building setback lines have not been violated prior to foundation construction.