4.0 LANDSCAPE


4.9 Sediment Control

In order to maintain clean streets and prevent siltation into storm sewers and drainage channels, all projects in Rosehurst are required to practice sediment control during construction. As soon as earthwork commences, sediment control methods shall be installed in such a way as to filter all storm water runoff from the tract into the public street. The sediment control system shall remain in place and in good repair until construction is complete, landscaping is installed, and lawns are established.

Builders shall conform to all regulatory agencies' rules, regulating standards, and criteria governing sediment control to include, but not limited to, ERA-NPDES. Builders shall be responsible for filing and securing all necessary permits.